The Response Turnaround report summarizes the turnaround time for preparing a response for a selection of Logs. The selection is based on the reporting period which may be monthly, quarterly or annual. The report is broken down by response type within a specified category or summary field. The following example shows a monthly report for correspondence "addressed to" Minister, broken down by Response Type. Logs that have an Interim response are reported separately. The report lists:
To Implement Response Turnaround ReportingThe Response Turnaround Report is not available by default as it relies on the configuration of User Defined Fields for supporting information as follows:
To activate the Response Turnaround Report see the Application Preferences. Calculating Response TimesResponse Turnaround times are calculated and stored in the Log record. The response times are based on the date Received and the date Signed. For example the number of days between the date Received and the date Signed is the Total turnaround time. Calculations are only done in terms of whole days with no rounding up. For example June 15,2008 to June 17,2008 is calculated as two days. Response times are only calculated after a Signed date has been entered in the Log. If a Referral is used for tracking the time to prepare a response, the response time will be reported as "time in office" and "time to prepare". This is calculated as follows:
Calculated turnaround times are shown in the Log after the Sign By field as "In Office/Preparation" days. The following sample shows an "In office" time of 5 days, and 22 days to "prepare response." Note that if there is no Sign Date then the response times are not calculated or shown.
Using Referrals to Track Response PreparationReferrals that are used for tracking response preparation can be marked for CLIFF to use in calculating response preparation time. Simply click the PR check box beside the Action field.
Note that only one "PR" Referral may be open at a time, and if there are over-lapping dates between multiple "PR" Referrals, CLIFF will not take the over-lap into consideration when calculating the response time. |
|||